St Thomas Walk Condominium Seiko Architectural
Year of Completion: 2017
Scope of Works: Design, Fabrication and Installation
Owner: Bukit Sembawang View Pte Ltd
Architect: DP Architects Pte Ltd
Facade Consultant: Nil
Main Contractor: Kimly Construction (Pte) Ltd

Key Façade Products:
– Unitised Curtainwall (17,000m2)
– Trellis / Screen (725 m2 / 454 m2)
– Window & Door (680m2)
– Glass Railing (1,200m2)
– Stainless Steel Hand Railing (143mr)
– Canopy(80.53m2)

St Thomas Walk Condominium Seiko Architectural
St Thomas Walk Condominium Seiko Architectural

St Thomas Walk Condominium Seiko Architectural